MTA-SM: Multi-machine path planning and time-window scheduling joint optimization method in hilly safflower harvesting
待确认10由 呆呆兽 发布于 2026/2/3 19:23:17
DOI:10.1016/j.compag.2026.111471
作者:Liwei Yang , Ping Li , Zhongshuo Ding , Chao Sun , Fei Chen , Yijiang Zheng , Yun Ge
文献类型:期刊论文
补充材料:只需要正文