Causes of Filtration the Water in Roller Compacted Concrete Dams RCC

J. O
{"title":"Causes of Filtration the Water in Roller Compacted Concrete Dams RCC","authors":"J. O","doi":"10.15224/978-1-63248-154-2-27","DOIUrl":null,"url":null,"abstract":"Roller compacted concrete (RCC) dam construction involves placing by compaction vibratory of concrete in successive layers of 30 to 45 cm thick. The RCC is a permeable material, especially on the surfaces of contact between layers, which are flat or together of potential weakness for the material. This constructive technology generates two areas of transition with RCC body dams it. A with the face of mass vivrate concrete (MVC) and the other with the rock of the footboard. The impermeability of the dam must rely to a thin layer of MVC, of the order of 0, 70m to 1, 30m thick, which forms a waterproof wall in contact with the water of the reservoir. It is complemented by joint water stop placed in the joints between blocks. A crack in the wall or placement joints defects water stop will allow the entrance of water to the body of the dam. If the constructive joints and transition areas were not resolved correctly, they will operate as preferential pathways of spatially connected at all the dam water circulation, so that you emerge in the face of water down a place away from the entry point. Therefore it is difficult to diagnosis and consequently the project. The water through the body of the dam can cause progressive deterioration of concrete due to leaching of calcium hydroxide by what while filtration volumes were eligible, at the time probably undertake the security of the dam. This paper presents a case and the reasons which gave rise to the waterproofing failures, processes observed deterioration and constructive recommendations to prevent the occurrence of such failures.","PeriodicalId":126283,"journal":{"name":"Eighth International Conference On Advances in Civil Structural and Mechanical Engineering ACSM 2018","volume":"76 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eighth International Conference On Advances in Civil Structural and Mechanical Engineering ACSM 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15224/978-1-63248-154-2-27","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Roller compacted concrete (RCC) dam construction involves placing by compaction vibratory of concrete in successive layers of 30 to 45 cm thick. The RCC is a permeable material, especially on the surfaces of contact between layers, which are flat or together of potential weakness for the material. This constructive technology generates two areas of transition with RCC body dams it. A with the face of mass vivrate concrete (MVC) and the other with the rock of the footboard. The impermeability of the dam must rely to a thin layer of MVC, of the order of 0, 70m to 1, 30m thick, which forms a waterproof wall in contact with the water of the reservoir. It is complemented by joint water stop placed in the joints between blocks. A crack in the wall or placement joints defects water stop will allow the entrance of water to the body of the dam. If the constructive joints and transition areas were not resolved correctly, they will operate as preferential pathways of spatially connected at all the dam water circulation, so that you emerge in the face of water down a place away from the entry point. Therefore it is difficult to diagnosis and consequently the project. The water through the body of the dam can cause progressive deterioration of concrete due to leaching of calcium hydroxide by what while filtration volumes were eligible, at the time probably undertake the security of the dam. This paper presents a case and the reasons which gave rise to the waterproofing failures, processes observed deterioration and constructive recommendations to prevent the occurrence of such failures.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
碾压混凝土坝滤水原因分析
碾压混凝土(RCC)大坝施工涉及通过压实振动将混凝土放置在30至45厘米厚的连续层中。碾压混凝土是一种渗透性材料,特别是在层与层之间的接触表面,这是一种具有潜在弱点的材料。这种建设性的技术与碾压混凝土体坝产生了两个过渡区域。A面为大质量振动混凝土(MVC),另一面为底板岩石。大坝的防渗必须依靠一层薄薄的MVC,厚度在0,70 m到1,30 m之间,它与水库的水形成一个防水墙。在砌块之间的接缝处还配有接缝止水带。墙的裂缝或接缝处的安置缺陷会使水进入坝体。如果施工接头和过渡区域没有得到正确的解决,它们将作为空间上连接所有大坝水循环的优先路径,这样你就可以在远离入口的地方出现在水面上。因此,很难诊断,因此项目。由于氢氧化钙的浸出,通过坝体的水会导致混凝土逐渐恶化,虽然过滤量是合格的,但当时可能会承担大坝的安全。本文介绍了一个案例和导致防水失效的原因,观察到的恶化过程以及防止此类失效发生的建设性建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Dam Breach Parameters and its Effects on Propagation of Flood Wave in the Downstream Stiffness Coefficients for Caisson Foundations Supporting Offshore Wind Energy Converters CONTROL SYSTEM STRATEGIES FOR VIBRATION ASSISTED GRINDING MACHINE Advanced method for station point control accuracy to monitor the behaviour in service stage of civil engineering structures using geodetic satellite technology Assessment of the Dynamic Response of Buildings Experimental Monitoring and FEM Simulations
wanfang
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1